ZERO FLOAT: A CONSTRUCTION INDUSTRY THRILLER (The Critical Path Series, Book 1)

Prijzen vanaf
11,91

Gesponsorde links

VERGELIJK ALLE AANBIEDERS (3)

Beschrijving

Bol ZERO FLOAT: A Construction Industry Thriller (The Critical Path Series, Book 1) By Mason Sterling Every delay has a cost. Every shortcut leaves evidence. "A structure fails long before it collapses. It fails the day someone decides the paperwork can carry a load the concrete can't." The Hook: A Building is Built Twice Every major infrastructure project is constructed twice: once in concrete and once in a story told through paperwork. But in a world of immovable deadlines and movable truths, the story and the structure often begin to diverge. For graduate site engineer Ethan Cole, a signature is about to become more dangerous than a falling crane. The Story: The Baseline Lie Ethan Cole is twenty-four years old and four days into his first job at the St. Catherine Medical Center-a landmark hospital project already thirteen months late and under intense political fire. While the public is promised a grand opening, Ethan discovers The Baseline Lie: a project schedule that looks perfect on a corporate dashboard but is physically impossible to build. As the project reaches Zero Float-the point where every single second of delay impacts the final deadline-the pressure to "manage documentary exposure" turns lethal. When a structural collapse leaves a man dead, Ethan is forced to choose between the "honest reporting" that could bankrupt the project and the "generous reporting" required to keep four hundred families paid. "The system does not need you innocent. It only needs you useful." Why Readers Love This Series - Technical Insider Authority: Drawing on years of exposure to how large infrastructure actually gets built, Mason Sterling provides a rare, authoritative view of the high-pressure world where money, power, and engineering judgment collide.- High-Stakes "Industrial Noir" Perfect for fans of Michael Crichton and J. Luke Bennecke, this series blends white-knuckle suspense with the technical realism of forensic engineering-from "logic ties" to "metadata trails" of a corporate cover-up [87, 187, Previous Advice].- Atmospheric Realism: A sensory journey into a site described as "twelve different wars sharing elevators," smelling of instant coffee and diesel, where the floor is never quite level underfoot.- Trilogy Momentum: Zero Float is the gripping first entry in The Critical Path Series, followed by The Variation Order and Ground Conditions. Follow Ethan Cole's evolution from a naive graduate to a powerful director who learns that leverage is the only thing stronger than steel. The Critical Path Series: - Book 1: Zero Float- Book 2: The Variation Order- Book 3: Ground Conditions "Every building has two foundations: the one shown on the drawings, and the one made of promises."

Vergelijk aanbieders (3)

Gesponsorde links · Sommige shops betalen ons een vergoeding

Sorteren op:

€ 11,91 Gratis verzending

€ 11,91 Gratis verzending

€ 12,00 € 2,99 verzendkosten Totaal € 14,99

Beschrijving (1)

ZERO FLOAT: A Construction Industry Thriller (The Critical Path Series, Book 1) By Mason Sterling Every delay has a cost. Every shortcut leaves evidence. "A structure fails long before it collapses. It fails the day someone decides the paperwork can carry a load the concrete can't." The Hook: A Building is Built Twice Every major infrastructure project is constructed twice: once in concrete and once in a story told through paperwork. But in a world of immovable deadlines and movable truths, the story and the structure often begin to diverge. For graduate site engineer Ethan Cole, a signature is about to become more dangerous than a falling crane. The Story: The Baseline Lie Ethan Cole is twenty-four years old and four days into his first job at the St. Catherine Medical Center-a landmark hospital project already thirteen months late and under intense political fire. While the public is promised a grand opening, Ethan discovers The Baseline Lie: a project schedule that looks perfect on a corporate dashboard but is physically impossible to build. As the project reaches Zero Float-the point where every single second of delay impacts the final deadline-the pressure to "manage documentary exposure" turns lethal. When a structural collapse leaves a man dead, Ethan is forced to choose between the "honest reporting" that could bankrupt the project and the "generous reporting" required to keep four hundred families paid. "The system does not need you innocent. It only needs you useful." Why Readers Love This Series - Technical Insider Authority: Drawing on years of exposure to how large infrastructure actually gets built, Mason Sterling provides a rare, authoritative view of the high-pressure world where money, power, and engineering judgment collide.- High-Stakes "Industrial Noir" Perfect for fans of Michael Crichton and J. Luke Bennecke, this series blends white-knuckle suspense with the technical realism of forensic engineering-from "logic ties" to "metadata trails" of a corporate cover-up [87, 187, Previous Advice].- Atmospheric Realism: A sensory journey into a site described as "twelve different wars sharing elevators," smelling of instant coffee and diesel, where the floor is never quite level underfoot.- Trilogy Momentum: Zero Float is the gripping first entry in The Critical Path Series, followed by The Variation Order and Ground Conditions. Follow Ethan Cole's evolution from a naive graduate to a powerful director who learns that leverage is the only thing stronger than steel. The Critical Path Series: - Book 1: Zero Float- Book 2: The Variation Order- Book 3: Ground Conditions "Every building has two foundations: the one shown on the drawings, and the one made of promises."


Productspecificaties

Merk Independently Published
EAN
  • 9798191153568
Maat


Prijshistorie

* Prijshistorie bevat geen data van Amazon, Amazon Marketplace.

Prijzen voor het laatst bijgewerkt op:

Uitgelichte Keuze
11,91
Naar shop