GROUND CONDITIONS: A CONSTRUCTION INDUSTRY THRILLER (The Critical Path Series, Book 3)

Prijzen vanaf
15,00

Gesponsorde links

VERGELIJK ALLE AANBIEDERS (3)

Beschrijving

Bol GROUND CONDITIONS: A Construction Industry Thriller (The Critical Path Series, Book 3) By Mason Sterling The ground remembers what the record forgets. "A structure fails long before it collapses. It fails the day someone decides the paperwork can carry a load the concrete can't." THE HOOK: Beneath the Promises Three years after the scandals of the Aurelia Exchange, Ethan Cole has risen to the top. As a senior director on the multi-billion-dollar Meridian Crossrail programme, he is no longer the graduate engineer fighting the system-he is the man operating it. But as twin tunnels push deep beneath a dense urban district of heritage shophouses and a live metro line, Ethan discovers that the foundation of the entire project is built on a fabrication. THE STORY: The Reference Ground The "Reference Ground" was supposed to be a technical certainty. Instead, Ethan uncovers a documentary void: three critical boreholes-BH-44, 45, and 46-were scrubbed from the tender to secure political funding. While the client concealed the risk to protect their budget, the contractor secretly obtained the data through an informal bridge, pricing their tender to profit from the catastrophe they knew was coming. Now, the "Zone of Influence" is expanding. As intense monsoon rains accelerate settlement and heritage buildings begin to groan, the displacement reaches a lethal threshold. With a live tunnel carrying 200,000 daily passengers at risk of deforming, Ethan faces an immovable deadline and a nonlinear acceleration toward structural failure. For one night, he must reclaim the moral clarity of his younger self or become the most powerful "invisible hand" in a system that has already learned to impersonate him. "The system does not need you innocent. It only needs you useful."WHY READERS LOVE THE CRITICAL PATH SERIES: - Technical Insider Authority: Drawing on decades of exposure to how large infrastructure actually gets built, Mason Sterling reveals the gritty reality of the pressure points where money, power, and engineering judgment collide.- High-Stakes "Industrial Noir" Blending the cold precision of forensic engineering with white-knuckle corporate suspense, this series concludes with a high-stakes battle against systemic corruption.- Atmospheric Realism: A sensory journey into the "mud and rebar" of a deep retained excavation, smelling of diesel and "exhausted precision" while the city above teeters on the edge of a twelve-foot surface collapse.- Trilogy Resolution: Ground Conditions is the final installment in a complete narrative arc. Follow Ethan Cole's evolution from a naive graduate in Zero Float to a senior executive who realizes that in a world of movable truths, a signature can be more dangerous than a falling crane. THE CRITICAL PATH SERIES: - Book 1: Zero Float- Book 2: The Variation Order- Book 3: Ground Conditions "Every building has two foundations: the one shown on the drawings, and the one made of promises."

Vergelijk aanbieders (3)

Gesponsorde links · Sommige shops betalen ons een vergoeding

Sorteren op:

€ 15,00 € 2,99 verzendkosten Totaal € 17,99

€ 15,58 Gratis verzending

€ 15,58 Gratis verzending

Beschrijving (1)

GROUND CONDITIONS: A Construction Industry Thriller (The Critical Path Series, Book 3) By Mason Sterling The ground remembers what the record forgets. "A structure fails long before it collapses. It fails the day someone decides the paperwork can carry a load the concrete can't." THE HOOK: Beneath the Promises Three years after the scandals of the Aurelia Exchange, Ethan Cole has risen to the top. As a senior director on the multi-billion-dollar Meridian Crossrail programme, he is no longer the graduate engineer fighting the system-he is the man operating it. But as twin tunnels push deep beneath a dense urban district of heritage shophouses and a live metro line, Ethan discovers that the foundation of the entire project is built on a fabrication. THE STORY: The Reference Ground The "Reference Ground" was supposed to be a technical certainty. Instead, Ethan uncovers a documentary void: three critical boreholes-BH-44, 45, and 46-were scrubbed from the tender to secure political funding. While the client concealed the risk to protect their budget, the contractor secretly obtained the data through an informal bridge, pricing their tender to profit from the catastrophe they knew was coming. Now, the "Zone of Influence" is expanding. As intense monsoon rains accelerate settlement and heritage buildings begin to groan, the displacement reaches a lethal threshold. With a live tunnel carrying 200,000 daily passengers at risk of deforming, Ethan faces an immovable deadline and a nonlinear acceleration toward structural failure. For one night, he must reclaim the moral clarity of his younger self or become the most powerful "invisible hand" in a system that has already learned to impersonate him. "The system does not need you innocent. It only needs you useful."WHY READERS LOVE THE CRITICAL PATH SERIES: - Technical Insider Authority: Drawing on decades of exposure to how large infrastructure actually gets built, Mason Sterling reveals the gritty reality of the pressure points where money, power, and engineering judgment collide.- High-Stakes "Industrial Noir" Blending the cold precision of forensic engineering with white-knuckle corporate suspense, this series concludes with a high-stakes battle against systemic corruption.- Atmospheric Realism: A sensory journey into the "mud and rebar" of a deep retained excavation, smelling of diesel and "exhausted precision" while the city above teeters on the edge of a twelve-foot surface collapse.- Trilogy Resolution: Ground Conditions is the final installment in a complete narrative arc. Follow Ethan Cole's evolution from a naive graduate in Zero Float to a senior executive who realizes that in a world of movable truths, a signature can be more dangerous than a falling crane. THE CRITICAL PATH SERIES: - Book 1: Zero Float- Book 2: The Variation Order- Book 3: Ground Conditions "Every building has two foundations: the one shown on the drawings, and the one made of promises."


Productspecificaties

Merk Independently Published
EAN
  • 9798191708119
Maat


Prijshistorie

* Prijshistorie bevat geen data van Amazon, Amazon Marketplace.

Prijzen voor het laatst bijgewerkt op:

Uitgelichte Keuze
15,00
Naar shop