An Introduction to Electrical Load Estimating for Professional Engineers

Prijzen vanaf
41,99

Uitgelicht

VERGELIJK ALLE AANBIEDERS (3)

Beschrijving

Bol Before specific electric power sources and distribution systems can be considered, realistic preliminary load data must be compiled. The expected electric power demand on intermediate substations, and on the main electric power supply, shall be calculated from the connected load by applying appropriate factors. Determine these factors by load analysis and by combining loads progressively. To combine the loads, start at the ends of the smallest feeders and work back to the electric power source. Because all loads must be on a common kilowatt (kW) or kilovolt-ampere (kVA) basis, it is necessary to convert motor horsepower ratings to input kilowatts or kilovolt- amperes before combining them with other loads already expressed in those terms. Preliminary electric power load estimates can be made by using the approximate value of one kilovolt-ampere of input per horsepower (hp) at full load. Preliminary estimates of lighting loads may be made by assuming watts per ft2 (m2) of building area. To determine appropriate load estimating factors, using the tables and factors below as guides analyze the characteristics of each load. Consider items such as environmental conditions of weather, geographical location, and working hours, as the situation dictates. Notice that when the load densities in w/ft2 (m2) are used only in preliminary estimates, the demand and load factors will be used in the final designs.

Vergelijk aanbieders (3)

Shop
Prijs
Verzendkosten
Totale prijs
41,99
Gratis
41,99
Naar shop
Gratis Shipping Costs
44,17
Gratis
44,17
Naar shop
Gratis Shipping Costs
44,17
Gratis
44,17
Naar shop
Gratis Shipping Costs
Beschrijving (2)
Bol

Before specific electric power sources and distribution systems can be considered, realistic preliminary load data must be compiled. The expected electric power demand on intermediate substations, and on the main electric power supply, shall be calculated from the connected load by applying appropriate factors. Determine these factors by load analysis and by combining loads progressively. To combine the loads, start at the ends of the smallest feeders and work back to the electric power source. Because all loads must be on a common kilowatt (kW) or kilovolt-ampere (kVA) basis, it is necessary to convert motor horsepower ratings to input kilowatts or kilovolt- amperes before combining them with other loads already expressed in those terms. Preliminary electric power load estimates can be made by using the approximate value of one kilovolt-ampere of input per horsepower (hp) at full load. Preliminary estimates of lighting loads may be made by assuming watts per ft2 (m2) of building area. To determine appropriate load estimating factors, using the tables and factors below as guides analyze the characteristics of each load. Consider items such as environmental conditions of weather, geographical location, and working hours, as the situation dictates. Notice that when the load densities in w/ft2 (m2) are used only in preliminary estimates, the demand and load factors will be used in the final designs.

Amazon

Pages: 89, Paperback, Independently published


Productspecificaties

Merk Independently Published
EAN
  • 9798182214384
Maat


Prijshistorie

* Prijshistorie bevat geen data van Amazon, Amazon Marketplace.

Prijzen voor het laatst bijgewerkt op:

Uitgelichte Keuze
41,99
Naar shop