The Planning Engineer's Field Handbook: Baseline to Closeout: A Practical Guide Building, Updating and Defending Construction Schedules

Prix à partir de
16,08

En vedette

COMPARER TOUS LES MAGASINS EN LIGNE (2)

Description

The Planning Engineer's Field Handbook: Baseline to Closeout: A Practical Guide Building, Updating and Defending Construction Schedules

Comparer les boutiques en ligne (2)

Trier par:

16,08 € Livraison gratuite

16,08 € Livraison gratuite

Description (0)

The Planning Engineer's Field Handbook: Baseline to Closeout: A Practical Guide Building, Updating and Defending Construction Schedules


Spécifications du produit

Marque Independently Published
EAN
  • 9798161728192

Choix en vedette
16,08 €
Voir l’offre