Built Faster, Delayed Longer: Why Modular Construction Exposes What the Industry Was Never Designed to Handle

Prix à partir de
15,25

En vedette

Description

Built Faster, Delayed Longer: Why Modular Construction Exposes What the Industry Was Never Designed to Handle

Comparer les boutiques en ligne (1)

Shop
Prix
Affranchissement
Prix total
15,25 
Gratuit
15,25 
Voir l’offre
Gratuit Shipping Costs
Description (0)

Built Faster, Delayed Longer: Why Modular Construction Exposes What the Industry Was Never Designed to Handle


Spécifications du produit

Marque Independently Published
EAN
  • 9798257712043

Choix en vedette
15,25 
Voir l’offre